COURSE 01 / ONLINE & SELF-PACED
Pump Systems Fundamentals for Water & Wastewater Operators
A practical operator-focused introduction to centrifugal pumping systems commonly encountered in drinking-water and wastewater facilities. The course explains the purpose of a pump system, how suction and discharge conditions affect operation, common indicators of abnormal performance, cavitation awareness, routine observations, and a structured approach to deciding when an issue can be handled through normal operating checks versus when it should be escalated for maintenance.
What you’ll learn
- Identify the main parts and purpose of a basic pumping system.
- Explain how suction conditions, discharge conditions, flow, and head affect pump operation at a practical level.
- Recognize common warning signs of abnormal pump operation, including loss of prime, restricted flow, cavitation symptoms, vibration, leakage, and overheating.
- Apply a simple operator troubleshooting sequence before escalating an equipment problem.
- Distinguish routine observation and operating checks from maintenance tasks that require qualified personnel or facility-specific procedures.
Course outline
- Course Orientation
- Section 1 — Pump System Basics
- Knowledge Check 1
- Section 2 — Suction, Discharge, Flow and Head
- Knowledge Check 2
- Section 3 — Recognizing Abnormal Operation
- Knowledge Check 3
- Section 4 — Routine Operator Checks and Escalation
- Practical Operator Scenario
- Final assessment
Who this course is for
North Carolina drinking-water and wastewater operators.
Prerequisites: None
View the proposed timed agenda
| Activity | Planned time |
|---|---|
| Orientation and pump-system overview | 5 min |
| Section 1 — Pump system basics | 9 min |
| Knowledge Check 1 | 3 min |
| Section 2 — Suction, discharge, flow and head | 9 min |
| Knowledge Check 2 | 3 min |
| Section 3 — Recognizing abnormal operation | 9 min |
| Knowledge Check 3 | 3 min |
| Section 4 — Routine operator checks and escalation | 8 min |
| Practical troubleshooting scenario | 6 min |
| Final assessment | 5 min |
| Total planned | 60 min |
Timing note: This is the planned agenda. Requested hours must be confirmed through beta/field testing before submission.